17th Edition update - IEE Regulations 2008

The 17th edition of BS7671:2008 wiring regulations were first published in January 2008.

From 1st July 2008 any installation that is tested, designed or constructed will have to comply with the 17th Edition regulatory changes.

The amendments bring the UK in line with European standards and the additional requirements are quite wide ranging. This will undoubtedly lead to additional remedial repairs being required to bring installations up to scratch and the tests themselves will take far longer than was previously the case.

Any engineers carrying out fixed installation testing should have the upgraded qualification.

Maximum periods allowed between Periodic Inspections:

- Commercial Installations - 5 years.
- Industrial Installations - 3 years.
- Buildings open to the public - 1 year.
- External Installations - 3 years.
- Caravan Parks - 1 year.
- Fire Alarms - 1 year.
- Short Term Installations - 3 months.
- Site Installations - 3 months.
 

Make an enquiry with us today about periodic testing and inspection.

Make an enquiry

  

Your Name (Required)

Email Address (Required)

Phone Number (Required)

Enquiry Type

Further Comments:

 

 

Product recall info - up to date list of goods with electrical faults

Contact us - PAT Resources - Our PAT fees - Fire Safety Information

 

©2007-2008 All rights reserved Circuit Electrical Testing Ltd